View Categories

SNAD® stud Application Guide

Overview #

This article outlines the correct procedure for installing SNAD® domed studs used to secure canvas, covers, cushions, and other removable fabric components without drilling into the vessel. Proper installation is essential to achieve maximum adhesive strength and long-term reliability.

Before You Begin #

  • Ensure the mounting surface is clean, dry, and structurally sound.
  • The surface should be smooth and free from wax, polish, silicone, oil, grease, salt, or other contaminants.
  • The recommended application temperature is 70°F to 100°F (21°C to 38°C). Avoid installation on cold, wet, or excessively hot surfaces.

Surface Preparation #

  1. Clean the mounting surface using a 50/50 mixture of isopropyl alcohol and water.
  2. Wipe the area with a clean, lint-free cloth and allow it to dry completely.
  3. Do not use solvents that may leave residue or damage the surface finish.

Installation Procedure #

  1. Verify the final location before removing the adhesive backing.
  2. Peel the protective liner from the rear of the SNAD® stud.
  3. Carefully position the stud in the desired location.
  4. Apply firm, even pressure over the entire adhesive pad, including the center and edges, to ensure full contact with the mounting surface.
  5. Do not reposition the stud once it has been applied, as this will reduce adhesive performance.

Adhesive Cure Time #

The adhesive bond continues to strengthen after installation. For best results:

Time After InstallationApproximate Bond Strength
20 minutes50%
1 hour75%
24 hours90%
72 hours100%

Avoid attaching or placing significant loads on the SNAD® stud until the full 72-hour cure period has elapsed whenever possible.

Best Practices #

  • Install only on clean, dry, high-energy surfaces.
  • Apply firm pressure during installation to maximize adhesive contact.
  • Allow the adhesive to fully cure before use.
  • Inspect SNAD® studs periodically for signs of wear, contamination, or adhesive deterioration.
  • Replace any stud that becomes loose or damaged.

Ocean Alexander Recommendation #

When installing or replacing SNAD® domed studs aboard an Ocean Alexander yacht, always ensure the mounting surface is compatible with adhesive-backed fasteners and has been properly cleaned before installation. Avoid mounting on surfaces with peeling coatings, wax buildup, or damaged finishes. Following the recommended surface preparation and cure times will provide the best long-term performance and help prevent premature adhesive failure in the marine environment.

Contact our Service Department today
(954.530.2033)
To learn how we can help ensure safe and peak performance for your vessel.

East Coast Yacht Group
2955 West State Road 84
Fort Lauderdale, FL 33312